Capacitor kVAR for motor: fit about 4 kVAR on a 10 HP motor and an APFC panel for mixed loads. Bihar bills LT factories in kVAh, so low PF costs money.

For a motor, the usual rule of thumb is a fixed capacitor of about one third to two fifths of the motor HP in kVAR: around 2 kVAR for a 5 HP motor, 4 kVAR for 10 HP and 6 kVAR for 20 HP. If a rice mill, cold storage or factory runs many motors that start and stop at different times, an APFC panel works better than fixed capacitors, because it switches capacitor steps in and out on its own to hold the power factor close to 1.

This matters more in Bihar now. The BERC tariff chart for FY 2026-27 shows LT industrial (LTIS) and HT industrial (HTIS) energy charges per kVAh and demand charges per kVA. When your power factor is low, both numbers go up. This guide is for contractors, electricians and plant owners in Purnea, Kishanganj, Katihar and Forbesganj, and the same sizing logic works for factories across North Bengal, Bihar and Sikkim.

Why does low power factor raise my electricity bill in Bihar?

Motors, welding sets and old tube light chokes draw “reactive” current. It does no useful work, but it still flows through your cable and the meter.

On a kVAh meter, the units billed are roughly your kWh divided by the power factor. So:

Power factorkWh usedkVAh billed (approx.)Extra units vs PF 1.0
1.001,0001,0000%
0.951,0001,053about 5%
0.901,0001,111about 11%
0.801,0001,250about 25%
0.701,0001,429about 43%

This is simple arithmetic, not a tariff clause. Your kVA demand reading rises the same way, and in Bihar demand is charged per kVA every month. A mill running at 0.8 PF is paying for power it never used.

Also note: as per a SolarQuarter report on the BERC order, from 1 April 2026 all users with contract demand above 10 kW (except agriculture) are billed on time-of-day (ToD) rates. Ask NBPDCL or read your bill for the exact power factor terms on your connection.

How much kVAR capacitor for which HP motor?

For single motors, most electricians fit a fixed capacitor across the motor terminals or after the starter, so it comes on only when the motor runs. The chart below is the recommended chart published by one state utility, KSEB. It is a good starting point for 3-phase LT induction motors in Bihar too, but it is not a Bihar rule.

Motor rating (HP)Capacitor (kVAR)
Up to 31
Above 3 up to 52
Above 5 up to 7.53
Above 7.5 up to 104
Above 10 up to 155
Above 15 up to 206
Above 20 up to 257.5
Above 25 up to 3010
Above 30 up to 4012
Above 40 up to 5014
Above 50 up to 6018
Above 60 up to 8022
Above 80 up to 10025

Do not oversize a capacitor fixed directly on a motor. Too much kVAR can push the motor voltage up when it is switched off and stress the winding. If a motor runs mostly at part load (like a lightly loaded huller or blower), the right value may be lower. Your electrician can check with a clamp meter or power analyser.

Fixed capacitor or APFC panel: which one do I need?

Your siteBetter choiceWhy
One or two motors that run steadily (borewell, single chakki)Fixed capacitor per motorCheap, simple, switches with the motor
Rice mill, flour mill, oil mill with many motorsAPFC panel at the main LT panelLoad changes all day; panel follows it
Cold storage with compressors cyclingAPFC panelCompressors start and stop on their own
Factory with VFDs, UPS or many LED driversAPFC panel with detuned reactorsHarmonics can damage plain capacitors
HT connection with own transformerAPFC on LT side plus fixed kVAR for transformer no-loadCovers both plant and transformer

An APFC (Automatic Power Factor Correction) panel has a PF relay, a CT on the incoming supply, capacitor-duty contactors and several capacitor steps (for example 5 + 10 + 10 + 25 kVAR). The relay reads the power factor every few seconds and adds or removes steps.

How do I calculate APFC panel kVAR for a factory?

The basic formula used by panel builders is:

kVAR needed = kW × (tan φ1 − tan φ2)

where φ1 is the angle at your present PF and φ2 at the target PF. In practice, you can use this multiplier table (target PF 0.99):

Present PFMultiply kW by
0.700.88
0.750.74
0.800.61
0.850.48
0.900.34

Example: a mill in Purnea with a 100 kW running load at PF 0.80 needs about 100 × 0.61 = 61 kVAR. A panel builder would usually round up to a 75 kVAR APFC panel with steps that can be combined in small jumps. The multipliers are standard trigonometry; the step layout is general trade practice, so get the final design checked against your actual load readings.

Good data to collect first: last 6–12 months of electricity bills, the connected load list (motor HP, welding sets, compressors) and a PF reading taken during normal working hours.

What to write in a BOQ for an APFC panel?

For trade buyers and tender work, a clear spec saves rework. Mention:

  • Total kVAR and step arrangement (e.g. 75 kVAR: 1×5, 1×10, 2×10, 1×20, 1×20)
  • System voltage: 415 V, 3-phase, 50 Hz; capacitor rated voltage (often 440 V, or 480–525 V with detuned reactors)
  • Capacitor type: MPP / gas-filled or heavy-duty, self-healing to IS 13340
  • Detuned reactor: 7% (or as per harmonic study) where VFDs or UPS loads are present
  • Capacitor-duty contactors for each step
  • Microprocessor APFC relay with display of PF, voltage and current
  • Incomer MCCB rating and kA, step protection (MCB/HRC fuse), CT ratio
  • Enclosure: powder coated CRCA, IP rating, cooling fan, earthing terminals
  • Test certificates, wiring diagram and warranty papers

For motor starters and the main breaker, see our guides on DOL vs star delta starter and MCCB rating for load.

Why is my capacitor or APFC panel not improving power factor?

Common problems we hear from sites:

  • Capacitors have lost value. Old capacitors swell or drop kVAR with heat and age. Measure the current on each step.
  • Blown fuse or tripped MCB on a step. The relay calls the step but nothing happens.
  • CT in the wrong place. The CT must be on the incoming supply, before the capacitor tap-off, on the phase the relay expects.
  • Relay settings wrong. Target PF, CT ratio or step delay not set.
  • Harmonics. Plain capacitors heat up and fail early on VFD-heavy loads. Use detuned reactors.
  • Leading PF at night. Fixed capacitors left on with no motor load can over-correct. Let the APFC switch them out.

Always have a licensed electrician work on capacitor panels. Capacitors hold charge after switch-off; wait for the discharge time and test before touching.

Why buy APFC panels and capacitors from a local authorised dealer?

Capacitors are an easy place for fake or under-rated stock to slip in. Shree Shyam Suppliers is an authorised dealer for Havells, Lauritz Knudsen (L&T) and Mescab, and we also deal in Siemens, Schneider and other brands, so you get genuine material with proper papers. We can put the capacitors, contactors, relay, MCCB, cables and lugs on one itemised quote, which makes checking a BOQ easier. We are based in Siliguri and deliver across Bihar, North Bengal, West Bengal and Sikkim.

Ordering tip

Send us on WhatsApp: your connection type (LT/HT) and sanctioned load, present power factor from your bill, list of motors with HP, whether you have VFDs or UPS, the kVAR you want (or ask us to help work it out), preferred brand, and your site location. Shree Shyam Suppliers will send an itemised quote with today’s rates.

Quick answers

How much kVAR capacitor for a 5 HP motor?

About 2 kVAR is the usual value for a 3-phase 5 HP motor. Fit it after the starter so it switches on and off with the motor.

What is a good power factor for a factory?

Aim for 0.98 to 0.99. On kVAh billing, every point below 1 means you are billed for more units than the work you actually got.

Is APFC panel necessary for a rice mill?

Not by default, but a rice mill with many motors switching through the day usually holds power factor much better with an APFC panel than with fixed capacitors alone.

How long does a capacitor last in an APFC panel?

It depends on heat, voltage and harmonics. Check each step's current at least once a year and replace capacitors that have swollen or lost kVAR.